Maintenance Management (CMMS) Software

Bring downtime inside the capacity plan. Planned maintenance should land on the calendar without colliding with work orders.

The Jovi ERP maintenance module is a CMMS layer covering asset and equipment records, preventive maintenance schedules, breakdown and downtime logging, and spare parts management. Work order management, checklists and maintenance cost tracking are tied to the production capacity plan.

MAINTENANCE · 8 WEEKS 1 asset overdue
  • CNC lathe CNC-04 62% overdue
  • Welding robot ROB-02 88% near hour threshold
  • Compressor CMP-01 41%
  • Forklift FLT-03 25%
Next service ROB-02 · 1 weeks
Overdue 1
today
Four assets on one time axis. A marker behind the today line is an overdue service — a comparison the drawing performs and a list of dates leaves to the reader. The hour bars show how close each asset is to its threshold. Representative interface.

The Jovi ERP maintenance module moves downtime inside the capacity plan. Planned maintenance is scheduled against open work orders, and warns about collisions before the plan is committed.

When a maintenance work order opens, the spare parts used are issued from stock and the time and cost are written back to the equipment record. A machine’s real annual cost becomes a record rather than an estimate.

Use case

A workshop with eighteen CNC machines shifts planned maintenance into low-load hours. The AI engine derives failure probability from downtime history and running hours, and proposes usage-based intervals in place of fixed ones.

What you can do

  • Asset records

    Keep machine identity, technical data, maintenance history and cost on one card.

  • Preventive plans

    Define plans by interval or running hours; work orders open themselves.

  • Breakdown and downtime logging

    Record duration, cause and intervention — and let it flow into OEE.

  • Spare parts

    Track critical part levels and issue them from stock against the maintenance work order.

  • Checklists

    Define a step-by-step checklist per maintenance type, ticked off on the floor.

  • Cost tracking

    Total parts, labour and external service cost per piece of equipment.

Capabilities

Maintenance planning

Schedule downtime alongside the production calendar.

  • Periodic plans
  • Running-hour plans
  • Collision warnings against the production plan
  • Resource assignment

Work order management

Follow the job end to end.

  • Automatic work orders
  • Priority and urgency
  • Technician assignment
  • Duration and cost capture

Spare parts

Have the right part ready at the right moment.

  • Critical parts list
  • Minimum stock alerts
  • Part-to-equipment mapping
  • Consumption history

Analysis and reporting

See where downtime actually comes from.

  • MTBF / MTTR
  • Downtime cause analysis
  • Equipment cost report
  • Maintenance compliance

What it changes

  • Planned maintenance that does not collide with work orders
  • Less unplanned downtime
  • Critical spares on hand when maintenance starts
  • Real maintenance cost visible per machine
  • Recurring failures identified
  • Maintenance history usable as audit evidence

With AI

  • Failure probability from downtime history and running hours
  • Usage-based intervals instead of fixed periods
  • Critical spare stock level calculation
  • Recurring failure pattern detection

Typically deployed in

  • Manufacturing plants
  • Automotive suppliers
  • Metalworking
  • Food production
  • Energy
  • Logistics fleets
  • Chemicals
  • Textiles

Works with

Frequently asked questions

What is a CMMS, and is this one?

A CMMS is a computerised maintenance management system: software holding equipment records, maintenance schedules, breakdown history and spare parts in one place. The Jovi ERP maintenance module covers those functions; the difference is that the maintenance calendar lives in the same system as the production plan.

How is a preventive maintenance schedule set up?

A period or running-hours threshold is defined on the equipment record; when it is reached a maintenance work order opens automatically with its checklist attached. The AI layer can propose an interval based on actual usage instead of a fixed period.

How reliable is the breakdown prediction?

Failure likelihood is estimated from downtime history and running hours, and recurring fault patterns are flagged. This is a probability estimate, not a claim of certainty, and every suggestion is shown together with the data it rests on.

How does maintenance affect the production schedule?

A maintenance work order appears in the capacity plan as downtime. The production schedule is then built around the maintenance window, so planned maintenance stops being the thing that breaks a delivery date after the fact.